Skip to content
ReceiptNoticeUS immigration only

EB-4

Certain special immigrants

The queue is moving faster than the calendar

Over the 12 months to November 2026, the all-areas cut-off advanced 29.5 months. That is 2.46 months of queue per month of real time. The queue gained ground on the calendar over that year.

Across the record here the cut-off moved 47.4 months between October 2023 and November 2026, 37 months apart. A cut-off was published in 32 of the 38 issues in that span, so the figure covers the months in which one was published rather than the record as a whole. Past pace is a record of what happened, not a schedule.

Movement, all areas

Final Action Dates across the 38 published months.

no numbersSep 18Oct 19Dec 20Feb 22Apr 23Nov 23Mar 24Jul 24Nov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26
Published cut-offOne month per monthno numbers

By country of chargeability

EB-4 by area and chart
AreaFinal Action DatesDates for FilingSince OctoberPace, 12mo
All chargeability areas except those listed15 Dec 202201 Jan 2025no move2.46x
China, mainland born15 Dec 202201 Jan 2025no move2.46x
India15 Dec 202201 Jan 2025no move2.46x
Mexico15 Dec 202201 Jan 2025no move2.46x
Philippines15 Dec 202201 Jan 2025no move2.46x

What the record shows

Measured across the 38 issues published here, for this category alone.

How far apart the countries are

In November 2026 every country with a dated cut-off in this category sits on the same date, so there is no country spread to report.

How steady the movement is

The mean step is the average size of one month of movement, in either direction. A cut-off that averages sixty days a month but stands still half the time behaves nothing like one that advances thirty days every month, and the two figures together say which this is.

  • All areas, China, India, Mexico and Philippines: 71.6 days of movement in an average month, standing still in 60 percent of them. The longest unchanged run was 7 months on 01JAN21, July 2024 to February 2025. No numbers at all for 6 issues, April 2025 to September 2025. Dates for Filing currently sits 24.6 months ahead of Final Action Dates.

The annual reset

The bulletin runs on a fiscal year beginning 1 October. Pooling every country across the 75 comparisons that fall in those two quarters, the October-to-December quarter advanced 6.9 days in an average month and the July-to-September quarter advanced 35.7 days.

Here the record runs the other way: the closing quarter moved more than the opening one, so a generous October and a flat August are not a rhythm this category has shown. Read a single month against this category’s own figures rather than the calendar’s reputation.

Backward steps on record

  • March 2025: All areas, China, India, Mexico and Philippines fell back 17.1 months, from 01JAN21 to 01AUG19.

Questions this page answers

Why does EB-4 take so long?
Between October 2023 and November 2026, 37 months apart, the all-areas cut-off moved 47.4 months, a pace of 1.28 months of queue for every month of real time. A cut-off was published in 32 of the 38 issues in that span, so the figure covers the months in which one was published rather than the record as a whole. Over the most recent 12 months, to November 2026, it moved 29.5 months, a pace of 2.46. The all-areas cut-off moved backwards in 1 of those 38 issues, so neither figure describes a steady advance. The bulletin does not publish a reason for the pace, and this site does not infer one.
Has EB-4 ever moved backwards?
Yes. Across the 38 issues published here the cut-off fell back in 1 of them, across 5 country columns, and 5 backward steps in all. The largest was 17.1 months, for All areas, China, India, Mexico and Philippines, in March 2025. A cut-off retrogresses when demand for a category exceeds what remains of its annual limit, and the numbers already promised have to be taken back.
Which country waits longest in EB-4?
No country waits longer than another here. Every country with a dated cut-off in this category sits on the same date in November 2026.
When will a particular priority date be reached?
The bulletin does not answer that, and neither does this site on its own authority. Past pace is a record of what happened, not a schedule. The history page offers a projection driven by a pace you choose, alongside the measured error of that method, which on this data misses by a median of several months even one year out.

Current values from the November 2026 bulletin, U.S. Department of State, Bureau of Consular Affairs. Movement computed across 38 published months, 12 for the headline pace.